Illustrative deal · Shut-in wells to gas-fired power
Idle wells are stranded gas. Stranded gas is power.
Which shut-in wells in a power-constrained region can be restarted to feed on-site generation for new large loads?
Bring one questionWhat surfaces
A grid-congestion watch fires. Large-load interconnection requests are rising and the queue is saturated.
What we evaluate
340 idle wells screened down to a 12-well cluster near substation-adjacent parcels. Operator and mineral owner resolved. Plug-and-abandon liability quantified.
Pursue a 12-well cluster, confidence moderate. Remaining reserves are uncertain because production history after shut-in is sparse.
How it moves forward
Operator acquisition plus gas offtake to on-site generation.
Potential capital: Energy PE · Project-finance lender · Royalty investor.
Actual restart rates and decline curves write back against the prediction.
Evidence that never guesses.
Our engine assembles public physical-world records into one governed surface. Publisher claims are tested against geographic evidence. Missing evidence stays visible; unresolved locations are not guessed. Reconciliation and source lineage make every answer traceable.
Every record carries its source. Customers govern their own use of it. Use, export and redistribution remain subject to applicable source terms.
Breadth, reconciliation, provenance.
Ten ways to see a physical asset.
Each domain combines authoritative sources, domain-specific scoring, geospatial intelligence, owner resolution and distress detection. An asset can rank high in several at once, and those overlaps are where layered origination lives.
Count each asset once. Keep every path.
The same site can be a well, a parcel, a water constraint and a power-reuse opportunity at once. SignalPattern detects when domains describe the same asset, de-overlaps the value, and preserves every exit path, so the pipeline is ranked by real options, not double counting.
A ranked site is useful. A site with an owner is a deal.
Assets resolve to owners, operators and contacts, linked parcel-to-owner and asset-to-owner, with an evidence package and a prioritized outreach path.
The site is not a dot. It is a financeable path.
One loop. Three products.
Same reasoning stack, same evidence chain, same governance. Use one, or close the loop from the first signal to funded capital.
Start with one site question.
Bring a live demand signal: the load, the region, the constraints. We return ranked, owner-resolved sites with the evidence behind each one.
Illustrative deal · Retired plant reuse for new firm power
A retired plant already has the hardest thing to get: a grid connection.
Which retired or marginal generation sites have interconnection and cooling that new firm power can reuse?
What surfaces
Watches on retirement announcements and firm-power procurement fire.
What we evaluate
Sites with an existing interconnect, water and land. Owners resolved.
Pursue one site: a phased microgrid first, then an advanced-nuclear evaluation.
How it moves forward
Development equity plus project finance.
Potential capital: Infrastructure fund · Strategic developer · Energy investor.
Permitting and interconnection timelines write back.